Wall Framing requirementsFind the length of walls A,B,C,D
A wall has structural components. Name all the components and state their functions
What timber treatment is the bottom plate and why?
How do we set our wall frames? Use HBG Branz book to help answer the questions
Which nogs do we cut and nail later after we build our frames.
what are the nailing requirements for the wall frames.

Framing members


At what height did you place all your lintels and why
The lintels were placed at 2010mm height because

What points did you consider when setting out wall frames

Studs were spaced at 1200mm centre to centre for the cladding
Nogs were spaced out 800mm

How many nails did you use to fix studs to the bottom and top plates what size and finish
3 nails nailed on the side